
Yc-Lok High Quality SS304 Shlg3-212.7 with 1/4" Imperial Bolts Combied Pipe Fixed Tube Clamp
Jiangsu YiCheng Fluid Equipment Co., Ltd.- Pressure:High Pressure
- Work Temperature:High Temperature
Base Info
- Model NO.:212.7
- Thread Type:Internal Thread
- Installation:KBG
- Material:Stainless Steel
- Type:Quick Connector
- Application:Hydraulic,Gas,Water
- Transport Package:Plastic Packaging Box and Pallet
- Trademark:YC-LOK
- Origin:China
- HS Code:3917400000
- Production Capacity:100000CS,One Month
- Package size per unit product:20.00cm * 15.00cm * 15.00cm
- Gross weight per unit product:0.500kg
- Lead Time:15 days (1 - 50 Pieces)
To be negotiated ( > 50 Pieces)
Description
2. Pics for reference




3. Company Profile
YC-LOK is the leader in the field of flow control technology manufacturers.
Our goal is beyond technical boundaries, the industry leader.
Since its inception, we have developed a research direction and developed precision valves, regulators, fluid connections and high-tech flow control systems.




4. Packing and Delivery
Packing
@ As per customer's specified requirements
@ Standard Export Packing:Carton+Pallet
Shipping
@ Small order: By express, TNT/ DHL/ UPS/ Fedex etc.
@ Large order: By sea or By air
@ Choose the best suitable way as your need.
1.Packaging Details: | 1. Wooden box 2. Carton 3. As your request. |
2.Delivery Detail: | Shipped in 15~30 days after payment |
3.MOQ: | 50 / 100 pcs |
4.Samples: | Free |
5.OEM Accepted | Yes |
6.Production Capacity: | 10,000pcs Per week |
7.Payment Term: | (1) L/C,T/T,D/P,D/A,PAYPAL,WESTERN UNION,MONEY GRAM |


5.RFQ
1. What is the acceptable MOQ?
For this,our acceptable MOQ is 100 pcs.
2. What is the Delivery time?
For samples,we usually have them in stock, so the delivery time will be quite short .
For normal order, the delivery time should be in 2 weeks.
3.What is the acceptable payment term?
Trade Assurance ,T/T, Western union, MoneyGram,Paypal.